menu

GDYNIA Relocation of punching machines

Location: Gdynia

Deadline for implementation: 21.02.2018

Scope of work: Relocation of punching machines

 

 

HVLFT carried out a comprehensive removal and loading service for the E5X PRIMA POWER (servo-electric turret punching machine). In place of the E5X, PG 1530 PRIMA POWER was unloaded and introduced.

 

Summary of assembly work.

 

The order used:

- the work of technical staff,

-specialized skates,

-hydraulic jack,

- a 3 ton class electric forklift,

- Liebherr LTM1040 hydraulic class 40 tonnes crane.

back