WARSAW relocation of machines for SANDOZ

July 2016 a comprehensive project of relocation of machinery for the production of medicines for Sandoz in the center of Warsaw.

The task required building a temporary bridge to pull the machine out of the window from the 3rd floor. The machines inside the plant were moved by means of air cushions. The entrance to the jetty with the help of special rolls. Delivery of new machines to the level of a temporary platform using a 200 ton hydraulic crane.